Aviapool Logo
Aviapool Logo
RSS Link
LinkedIn Link
Twitter Link
Facebook Link

SEARCH RESULTS: "INSTALLATION ROD"

Exact Match
Part Number Description Sources Available Tool Request Qty
2078.10.45.00INSTALLATION ROD1
2078.10.70.00INSTALLATION ROD1
2146.10.05.01INSTALLATION ROD1
2146.10.05.02INSTALLATION ROD1
269A4276INSTALLATION ROD1
269T9276INSTALLATION ROD2
J32061-5INSTALLATION ROD1
J32061-6INSTALLATION ROD1


Partial Match
Part Number Description Sources Available Tool Request Qty
109-3130-82-101TOOL SET, TAIL ROTOR CONTROL ROD BUSHING REMOVAL/INSTALLATION/BREAKOUT CHECK.1
18C1078FIXTURE, TIE-ROD / INSTALLATION1
1F10153Rod, Installation1
2078.10.70.00INSTALLATION ROD - METALICO1
2146.10.05.00INSTALLATION ROD COMPLETE1
2146.10.05.01INSTALLATION ROD - METAL1
2146.10.05.02INSTALLATION ROD - METAL1
269T9272INSTALLATION ROD, TAIL ROTOR DRIVE SHAFT1
269T9276Installation Rod, Tail Rotor Drive Shaft2
2A1856BUSHING, ROD SEAL INSTALLATION TOOL1
2A1865-1INSTALLATION/REMOVAL TOOL, ROD SEAL1
3G6205G05951TOOL,M/R DAMPER ROD END REMOVAL/INSTALLATION1
8098CONNECTING ROD BUSHING REMOVAL / INSTALLATION SET1
726698INSTALLATION OF ROD IN ACTUATOR BODY1
726892INSTALLATION OF BEARING ON LINK ROD1
726946SET FOR THE ROD ASSEMBLY INSTALLATION IN CYLINDER1
727299ROD INSTALLATION STOP1
6795635WRENCH INSTALLATION AND REMOVAL GAS PRODUCER TURBINE TIE BOLT NUT2
6795637WRENCH INSTALLATION AND REMOVAL GAS PRODUCER TURBINE REAR BEARING RETAINING NUT2
6795644WRENCH INSTALLATION AND REMOVAL GAS PRODUCER TURBINE FRONT BEARING RETAINING NUT2
6872543PRESS INSTALLATION POWER TURBINE REAR AND GAS PRODUCER TURBINE FRONT BEARING2
8042CCONNECTING ROD BUSHING INSTALLATION AND REMOVAL TOOL ADAPTER SET1
8072CCONNECTING ROD BUSHING INSTALLATION AND REMOVAL TOOL ADAPTER KIT1
956A3211FIXTURE - INSTALLATION HPT AIR DUCT / HPT ROTOR (FOR PRODUCTION ONLY)1
B27024-1REMOVAL/INSTALLATION FIXTURE - NEUTRAL SHIFT ROD SPRING1
B27053-1FIXTURE - SPRING INSTALLATION AND REMOVAL, RUDDER NEUTRAL SHIFT ROD2
C27076-1ADAPTER - TORSION ROD INSTALLATION LE SLAT1
C27076-9Adapter -Torsion Rod Installation. Leading Edge Slat4
C32038-55Rod End Bearing Removal/Installation Equipment - Actuators Main Landing Gear (MLG)6
C32038-81ROD END BEARING REMOVAL/INSTALLATION EQUIPMENT - ACTUATORS MAIN LANDING GEAR (MLG)2
CS-710-150DOOR ROD INSTALLATION TOOL1
EMB-01114-001MLG MAIN LOCKING ROD NUT REMOVAL/INSTALLATION WRENCH (GSE 129)1
EMB-01115-001SOCKET: NLG LOCKING ROD NUT REMOVAL/INSTALLATION1
GS23665LEAD WOOL INSTALLATION RODS1
GS23665-1LEAD WOOL INSTALLATION RODS2
HC130H0175-200Rod - N.L.G. installation replaces HC130H0175-0001
J21001-776. ROD - ALIGNMENT, AIR CONDITIONING PACK INSTALLATION4
J32068-5Installation rod assy1
J32083-4Installation Rod Assy2
K32023-7INSTALLATION ROD 11
K32023-8INSTALLATION ROD 21
K32024-5INSTALLATION ROD ASSEMBLY1
K52034-1WEIGHT COMPENSATION TOOL - HOLD-UP ROD, REMOVAL/ INSTALLATION, PASSENGER ENTRY DOOR4
PWA 101021ROD, INSTALLATION1
PWC46385INSTALLATION ROD - HP ROTOR1
PWC85864ROD - FAN INSTALLATION1
RB6872543PRESS INSTALLATION POWER TURBINE REAR AND GAS PRODUCER TURBINE FRONT BEARING2
ROC476014CONN ROD INSTALLATION TOOL1
T450041PINTLE ROD INSTALLATION TOOL1
T450527PINTLE ROD INSTALLATION REMOVAL TOOL1


Aviapool (Aviation Tool Pooling LLC) is a global company providing around the clock assistance for the planning, supply, and sourcing of tooling equipment to the commercial aviation marketplace.

We are making available to our customers a comprehensive one-stop solution in ensuring the right tooling equipment reaches you on time for your planned input needs. With a fully researched tooling database of over 600,000 items, across multiple aircraft types available to you, we are in a perfectly placed position to get you what you need on time and on budget.

We take your tooling requests, and source the items on your behalf. Just submit your items, and we do the rest.

Aviapool Logo
Recently added Tool List
© Copyright 2013 - 2025 Aviation Tool Pooling, LLC
Recently Quoted Tool List
Privacy
Cookies
Acceptable Use Policy